We’ve Been Framed!

Following our move back into Berrow Village Hall in February and the commitment to stage ‘Fringe benefits’ as our next production, we have had to overcome some significant problems.

For one, the village hall now has a suspended ceiling, which means our previously used lighting bars have been removed and cannot be put back.

stage 2 drama
The successful result of the trial assembly of our new frame

After weeks of research and more weeks of feverish calculation to decide what we could fit in and how the components could be fitted together, stored safely and fitted round our modular stage, we ordered a huge aluminium frame made by global truss.  This had to be shipped from Germany, so it was quite important to get the order exactly right!

We anxiously endured the weeks of waiting for the last few items to come into stock, and finally the frame was on its way to us…

A week later there was the lorry outside our door. In accordance with the instructions from the Supplier, we took the driver hostage while we checked off all the bits and pieces present and correct before finally allowing him to leave.

The next bit of fun was how to get the boxes (some of which were over 3 metres long) into the car and down to the hall.  This was easilly solved by opening the back window on the CRV and sticking the excess length out through it.

Next was the big trial assembly.  Ken and I had meticulously worked out that it could be safely assembled and would just clear the roof ties in the hall and amazingly, it did!

We needed 6 people in total. Four to help with the assembly and lifting into position of the legs, and the others to connect the two halves.  It looks great and is really strong.  We are now very much poorer (the thing cost £1700), but hopefully we are a step closer to being able to stage our first production in the new hall.

I decided to call the frame ‘Helga’ as she came from Germany, (actually she came from Taiwan via Germany but I don’t know any Taiwanese names and anyway I think Helga suits her).

stage 2 drama
stage 2 stalwarts who turned up to help assemble "Helga"

From left to right: Ken, Dennis, Owen, Mike, Doreen, Serena, Greg

stage 2 hits the credit cards HARD!

Following the move into refurbished hall, we are left with a blank canvas…  On the plus side there is the bigger performing space / auditorium.  On the minus side there is a suspended ceiling to which we can no longer attach lighting bars, a lower ceiling which limits our lighting options, no wiring for lights or sound, no dedicated power supply, a hall management committee who are terrified to let us touch any structure or surface lest it be irrevocably scarred, and a show to put on in a few weeks time.  No pressure then!

under pressure
Now we really need to sell some flippin'tickets!

German engineering partly to the rescue; we have ordered a large aluminium box frame to go over the stage to which we can attach lighting and drapery.  Great! (but a mountain of cash).  We have also marshalled our local electrician for power supply fitting, purchased the requisite miles of cables / festoons of dmx thingies, other goobledegook wossits, extra tripods and hired led lights so as not to set the actors heads on fire… Credit card stretched beyond limits… “she canna take it cap’n   aaaaarrrrrg! [KABOOM!!!]  Not to worry then.

Now we REALLY need to sell some flippin tickets!!!